Does the existing facility currently have all required permits and what happens to those permits if and when you receive permits for the new Facility?

Yes, the existing operation is fully permitted. Pending the approval process for the Project, the new permit may include modifications to the existing permits and or permit conditions. A summary of the permits and approvals and/ or modifications of the existing permits that may be required is provided in Attachment B of the Environmental Assessment Form (EAF). Attachment C of the EAF provides a list of the current permits for the existing facility. A copy of the Air Title V Facility Operating Permit for the existing Astoria Generating Station may be obtained from the following website:

http://www.dec.ny.gov/dardata/boss/afs/issued_atv_e.html

Once permit applications are filed with the NYSDEC the status can be tracked using the following website:

http://www.dec.state.ny.us/cfmx/extapps/envapps/index.cfm